News

New project in Bolivia

BERALMAR is working on an important new project. This is the provision of a tunnel kiln and dryer for the new production line at CERÁMICA DEL ESTE in Santa Cruz de la Sierra (Bolivia).

...

See more

New order for solid fuel firing equipment in Morocco

BERALMAR has just booked a new order for solid fuel firing facility in Morocco. It is the BRIQUETERIE SAMARRA in Tangiers, which has ordered a MICROMATIC installation which uses micronized petroleum c...

See more

First solid-fuel firing installation in Macedonia

BERALMAR has just received its first order for a solid fuel firing facility in Macedonia. The MICROMATIC unit will be installed in a tunnel kiln at the CIGLANA KUMANOVO works in the town of the same n...

See more

New project in Algeria

BERALMAR has just received an order to supply a complete line for BRIQUETERIE TIMADANINE in Adrar (Algeria).

BRIQUETERIE TIMADANINE is already a BERALMAR customer, since in 2009 it was ...

See more

Construction of a tunnel kiln in Spain

BERALMAR has started work on the design and construction of a tunnel kiln for NUEVA CERÁMICA CAMPO in Pontevedra (Spain). The kiln will be 123.9 metres long and 4.16 metres wide, with a useful height...

See more

Commissioning of a solid fuel heat generator in Morocco

BERALMAR has just commissioned an installation consisting of a PULS combustion chamber for solid fuels coupled to a GB heat exchanger, to provide the clean, warm air needed in the dryer at the MIDABRI...

See more

First order for a PROMATIC facility in Albania

BERALMAR has just received its first order for a solid fuel firing facility in Albania. It is for a PROMATIC system, soon to be installed in the tunnel kiln at the KID ALB Sh.p.k. ceramics plant in Ma...

See more

New order for solid fuel firing equipment in Bosnia

BERALMAR has just booked a new order for solid fuel firing facility in Bosnia. It is for a PROMATIC system, soon to be installed in a kiln belonging to TOP ceramics in Banja Luka, the capital of Repu...

See more

Beralmar supplied 2,395 burners in 2010

BERALMAR began operations in 1964 with the manufacture of fuel oil jets for hoffmann kilns. Almost half a century has passed and the company has experienced important changes, but despite the wide ran...

See more

First solid fuel installation in Bosnia

BERALMAR has received the first order for a solid fuel firing installation in Bosnia and Herzegovina.

It will be a PROMATIC facility which will be installed in the kiln at the TVORN...

See more

New project in Algeria

In 2000, BERALMAR provided a FORNTHERMIC tunnel kiln and a MESTRAL model semi-continuous shelf dryer for the production of 400 tonnes/day for the BRIQUETERIE EL RYM in Annaba (Algeria). The project...

See more

Commissioning of a new factory in nador (Morocco)

BERALMAR has commissioned a new factory in Nador (Morocco). It is the SALAMABRIQ ceramics factory, owned by the Salama family, who had previously relied on BERALMAR for the construction of a tunnel ki...

See more

Order for 4 solid fuel firing systems in Colombia

LADRILLERÍA SANTA FÉ, the largest ceramic group in Colombia, has ordered four kilns from BERALMAR for their solid fuel firing facilities. The system chosen by LADRILLERÍA SANTA FE is the most s...

See more

Special order from India

BERALMAR has received an order for a MICROMATIC solid fuel firing system for a kiln for firing refractory pieces for TATA REFRACTORIES LTD. in Belpahar (India), which is part of one of the most import...

See more

BERALMAR at TECNARGILLA 2010

BERALMAR will again take part in the TECNARGILLA fair. Its 2010 edition will take place between 27 September and 1 October at the trade fair centre in Rimini (Italy). Visitors will find the BERALM...

See more

New MICROMATIC facilities in northern Morocco

BERALMAR's leadership in solid-fuel firing continues to grow stronger thanks to three new orders from northern Morocco, specifically for BRIQUETERIE ARGILUX in Oujda, MIDABRIQ in Midar and SALAMABRIQ ...

See more

New BIOMATIC installation in Malaysia

BERALMAR is preparing to supply a special solid fuel firing system for the BRICK DOTCOM ceramics facility at Kuala Kubu Bahru (Malaysia). It will be a BIOMATIC model, with technology suitable for firi...

See more

500th GB model heat generator

The GB model heat generator is certainly one of the most successful solutions in the BERALMAR range. BERALMAR manufactures it with 5 different capacities: 600,000, 800,000, 1,000,000, 1,500,000 and 2,...

See more