News
First order for a PROMATIC facility in Albania (Jun 22, 2011)
BERALMAR has just received its first order for a solid fuel firing facility in Albania. It is for a PROMATIC system, soon to be installed in the tunnel kiln at the KID ALB Sh.p.k. ceramics plant in Maminas, near the capital.
This facility will consume petroleum coke, and is designed to provide up to 70% of the energy consumed for a daily production of 650 tonnes of blocks of different formats.
This PROMATIC facility is now the tenth solid fuel firing facility ordered in the last 3 years in the Balkans, and the 110th supplied by BERALMAR worldwide since 2000.
+ info:
This facility will consume petroleum coke, and is designed to provide up to 70% of the energy consumed for a daily production of 650 tonnes of blocks of different formats.
This PROMATIC facility is now the tenth solid fuel firing facility ordered in the last 3 years in the Balkans, and the 110th supplied by BERALMAR worldwide since 2000.
+ info: