News
First solid-fuel firing installation in Macedonia (Jan 31, 2012)
BERALMAR has just received its first order for a solid fuel firing facility in Macedonia. The MICROMATIC unit will be installed in a tunnel kiln at the CIGLANA KUMANOVO works in the town of the same name in the north of the country.
The solid fuel used will be micronized petroleum coke. The MICROMATIC system features a silo for storing the fuel, a closed fuel transport pneumatic circuit, and a set of distributors and injectors in the firing area, with a centralised automatic control panel.
This system, a variation of PROMATIC for applications where the user has access to micronized (<100 m) and dry (<1% H2O) solid fuel, was launched for the first time in 2002 in Spain, where it has been installed in over 50 kilns. The MICROMATIC system has also been installed in other countries such as Morocco, Bosnia, Portugal, Greece, India, Chile, Colombia and the United States.
+ info:
The solid fuel used will be micronized petroleum coke. The MICROMATIC system features a silo for storing the fuel, a closed fuel transport pneumatic circuit, and a set of distributors and injectors in the firing area, with a centralised automatic control panel.
This system, a variation of PROMATIC for applications where the user has access to micronized (<100 m) and dry (<1% H2O) solid fuel, was launched for the first time in 2002 in Spain, where it has been installed in over 50 kilns. The MICROMATIC system has also been installed in other countries such as Morocco, Bosnia, Portugal, Greece, India, Chile, Colombia and the United States.
+ info: