BERALMAR ENERGIES strengthens its presence in the Middle East with a major new project ()

BERALMAR ENERGIES has been selected to supply the complete combustion systems for a new DRYER and tunnel KILN at a brick factory designed for a production capacity  of 1.200 tons per day.

The scope of supply includes six gas line burners for the dryer, with capacities of 2,908 kW and 1,163 kW, along with a comprehensive kiln combustion system consisting of:
  • One group of 8+8 lateral high-speed burners, model FOC/ML
  • One vertical group of 22 high-speed burners, model FOC/MV
  • 14 groups of 22 dual-fuel injectors (GAS–HFO), model ICV/GT
  • Gas safety ramps and HFO filtration and preheating unit.
  This configuration ensures precise temperature control, uniform firing, and excellent energy efficiency, offering full operational flexibility between GAS& HFO.  

This new project demonstrates once again the trust placed in BERALMAR ENERGIES by leading brick manufacturers and reinforces its position as a global benchmark in advanced combustion technologies for the heavy clay industry.
Middle East